by Elizabeth Baron | Jun 6, 2023 | Municipal Engineer, Project
LAK-84-3.61 SR 84 Resurfacing Willoughby, Ohio CT provided services on the $1.5M resurfacing of 4.2 miles of SR 84 from SR 91 to the East Corporation Line. This was an ODOT-administered project funded through ODOT’s Urban Paving Program. The design process followed...
by Elizabeth Baron | Jun 6, 2023 | Municipal Engineer, Project, Transportation
Homewood Dr Water Main and Pavement Improvements Wickliffe, Ohio CT applied for OPWC funding as a joint project with the City of Wickliffe and LCDU, as it provided a win-win for all parties. This local residential street was ranked as having one of the lowest PCR...
by Elizabeth Baron | Jun 6, 2023 | Municipal Engineer, Project, Water and Wastewater
West Main St Water Line Replacement Phase 1 Conneaut, Ohio CT performed the engineering design and construction administration and inspection for this OPWC-funded replacement of an existing 10-in asbestos cement water main. Polyvinyl Chloride Pipe, C909 water main and...
by Elizabeth Baron | Jun 6, 2023 | Municipal Engineer, Project, Transportation
Franklin/Hilliard Phase V Traffic Signals Lakewood, Ohio CT developed traffic signal plans to upgrade 13 traffic signals along Franklin Boulevard and Hilliard Road corridors. During the initial traffic study, it was discovered that one existing traffic signal was not...
by Elizabeth Baron | May 15, 2023 | Architecture, Construction Administration, Project, Structural
Convention Center Exhibit Hall Expansion Phase 3 Sharonville, Ohio The 36,000 sf addition will double the size of the exhibit hall and provide additional overhead height to accommodate sporting events. The Sharonville Convention Center is located on the north side of...