by Elizabeth Baron | Jun 6, 2023 | Municipal Engineer, Project
LAK-84-3.61 SR 84 Resurfacing Willoughby, Ohio CT provided services on the $1.5M resurfacing of 4.2 miles of SR 84 from SR 91 to the East Corporation Line. This was an ODOT-administered project funded through ODOT’s Urban Paving Program. The design process followed...
by Elizabeth Baron | Jun 6, 2023 | Municipal Engineer, Project, Transportation
Homewood Dr Water Main and Pavement Improvements Wickliffe, Ohio CT applied for OPWC funding as a joint project with the City of Wickliffe and LCDU, as it provided a win-win for all parties. This local residential street was ranked as having one of the lowest PCR...
by Elizabeth Baron | Jun 6, 2023 | Municipal Engineer, Project, Water and Wastewater
West Main St Water Line Replacement Phase 1 Conneaut, Ohio CT performed the engineering design and construction administration and inspection for this OPWC-funded replacement of an existing 10-in asbestos cement water main. Polyvinyl Chloride Pipe, C909 water main and...
by Elizabeth Baron | Jun 6, 2023 | Municipal Engineer, Project, Transportation
Franklin/Hilliard Phase V Traffic Signals Lakewood, Ohio CT developed traffic signal plans to upgrade 13 traffic signals along Franklin Boulevard and Hilliard Road corridors. During the initial traffic study, it was discovered that one existing traffic signal was not...
by Elizabeth Baron | Apr 1, 2022 | Municipal Engineer, Project, Transportation
Amsterdam Road Reconstruction Fort Wright, Kentucky Improvements to this road included widening the 2,100 ft. road to a minimum of 24’ with a concrete curb and gutter on both sides. Improvements to this road included widening the 2,100 ft. road to a minimum of 24’...
by Elizabeth Baron | Apr 1, 2022 | Municipal Engineer, Project, Transportation
Reidlin Road Stabilization Taylor Mill, Kentucky CT worked with Geotechnology, Inc. to provide design drawings for a drilled shaft wall to stabilize the impacted section of Reidlin Road. CT coordinated the design of associated roadway improvements with the pier wall...