LAK-84-3.61 SR 84 Resurfacing
Willoughby, Ohio
CT provided services on the $1.5M resurfacing of 4.2 miles of SR 84 from SR 91 to the East Corporation Line.
This was an ODOT-administered project funded through ODOT’s Urban Paving Program. The design process followed the ODOT Minor Plan Development Process.
The scope of work included the 3” planning of existing asphalt pavement, removal and replacement of deteriorated curb and sidewalk, construction of a uniform 3” asphalt concrete overlay, and minor drainage improvements. A field investigation was performed to mark and measure estimated partial/partial depth pavement replacement areas.